| A) |
For Construction Sanctions |
1. |
Scrutiny fees :- Rs.2 per Sq.M. (Residential) / Rs. per Sq.M. (commercial & industrial).
Minimum Rs.100 (Residential) / min.Rs.300 (commercial & industrial).
Maximum Rs.10,000 (Residential) / maximum |
2. |
Fire capitation fee Rs.5/- per Sq.M. |
3. |
Extinction fee Rs.100/-per Sq.M. |
4. |
Construction deposit :- 1% of construction estimate cost(Minimum & Rs.3000/- construction cost as considered) |
5. |
Drainage fund & joining etc
i)If drainage exists : Rs.11 per Sq.M.
ii)If drainage line does not exist : per Sq.M.
iii)If construction/ area is less than 65 Sq.M. :Rs.11.84 per Sq.M. |
6. |
Development fees. Rs.per SQM
a) Residential or industrial org. Rs.60/-
b) Industrial use Rs.90/-
c)Commercial use Rs.120/-
d) Sanction of plans etc (at construction sanction file) Rs.30/- |
7. |
7.Proposals of plans,construction etc
a) Up to 0.3 Hectors. Rs.200/-
b)Between 0.3 &1 Hectors. Rs.400/-
c) Between 1 &2.5 Hectors. Rs.1000/-
d)Above 2.5 Hectors. Rs.1200/- |
8. |
Maps/certificate
Ordinary sized section plans/maps -: Rs.50/-
Zone certificates -: Rs.30/--&--
Red zone certificates:-Rs. 50/--&-- |
9. |
Income collection/division Rs. 200 for each chapter. |
10. |
F.S.I. Rs. 200 for each chapter. |
11. |
T.D.R Rs. 200 for each chapter. |
12. |
No fees for demand for T.D.R , final map & approval for occupancy. |